Technical characteristics of concrete batching machine
· Coarse and fine weighing, high weighing precision;
· Excellent performance weighing sensor, accurate and stable weighing;
· The main accessories adopt well-known brands at home and abroad, with high reliability;
· The overall structure is reasonable, the stiffness is strong and beautiful;
· Smooth delivery to ensure normal feeding;
· Can weigh 4 kinds of aggregates at the same time, short measuring time, high efficiency;
· The head of the belt machine is equipped with a material shield to effectively prevent spilling;
· The tail is equipped with a screw tensioning device, which can adjust the tension of the belt at any time, convenient and fast;
· Vibrators are installed on the side walls of the sand bin and sand weighing bucket, which is conducive to fast weighing and unloading。
Concrete batchingMachine structure:
This series of concrete batching machine is composed of three parts: feeding system, weighing system and electrical control system。
(1) Feeding system: composed of storage hopper and feeding device, the main function is to store materials and feed to the weighing hopper under the control of the control system。
The form of feeding system: PLD800-1200 type, for the belt conveyor feeding;
(2) Weighing system: The weighing system is a key part of the batching machine, consisting of weighing hopper, suspension device and weighing system sensor, batching controller, etc。
(3) Electrical control system: The electrical control system is the core component of the batching machine, and its function is to realize the weighing, display, operation and complete various automatic batching procedures of the entire batching machine。The system is mainly composed of two parts: batching controller and strong current circuit。Its shape, structure and use are detailed in the "Dosage Controller Instruction Manual".。
The working principle of the machine:
Before work, the loader (which can be manually loaded when the dosing machine is installed underground) supplies sand and stone materials to each storage hopper respectively。
According to the instructions of the dosing controller, input the recipe to the dosing controller (the unused material must be set to 0)。After pressing the dosing button, the dosing machine will begin to enter the automatic dosing program。The working process is: first, the material I belt machine starts to work,Feed Ⅰ to the weighing hopper,When the weight of the material I in the hopper reaches its set value,Material I belt machine automatically stop;Then the material II belt machine automatically opens,When the weight of the material in the hopper reaches the sum of the set values of material I and material II,Material II belt machine stop,料Ⅲ皮带机开始工作… …,After the four kinds of materials are matched,The machine is in a waiting state。At this time, press the discharge button, the discharge belt machine works, and the prepared concrete dry material is discharged intoagitator料斗。After the discharging is completed, the discharging belt machine automatically stops, and automatically starts the second cycle of batching, the second cycle of batching ends, and waits for discharging, and so on。